- Bixby, Givens, & Steinberg - July 5, 6:30am to 6:30pm. There will be no domestic water and no fire protection water to allow contractors to tie into the water main.
- McMillan Hall - July 2 thru July 10. The east wing of the first floor will be closed for hardwood floor maintenance.
- Francis Gym - July 2 thru July 6. The floors by the main entrance doors will be closed for refinishing.
- Graham Chapel - July 2 thru July 13. The chapel will be closed to refinish the floors and replace the ceiling lamps.
- Women's Building - June 26 thru July 6. The stairs to the lower level on the south side of the building will be closed for reconstruction.
- McMillan Hall - June 27 thru July 20. The building will be experiencing tuckpointing so there may be vehicles or equipment on the fire lane. In the case of an emergency, the equipment and vehicles can be removed from the fire lane.
- Crow Hall - June 25 thru July 30. Portions of the sidewalk and fire lane surrounding Crow Hall may be blocked with equipment associated with the replacement of the roof.
- Millbrook Parking Garage - June 25 thru August 17. At any one time there will be no more than four parking spaces closed to paint the guard rails as weather permits.
- Eliot Hall Exterior Stairway - June 20 until further notice. The western exterior stairway of Eliot Hall will be closed until further notice for structural evaluation.
- Eliot Hall - June 11 thru July 20. The main elevator in Eliot Hall will be out of service for repairs.
- Brookings Hall - June 7 thru September 1. The roof is being replaced. Please expect to hear some noise, see equipment in the area and smell the non-toxic odor from the glue during the day. Beware of men working above.
- Goldfarb Hall Commons Area - May 31 thru August 17. The area will be closed for the renovation of the lobby and dining area.
- Lopata Hall - May 21 thru August 15. The second and third floors will be closed for renovation.
- Skinker at Brookings and Lindell - May 21 thru August 15. The intersection on Skinker at Brookings and Lindell will be renovated and will have various lane changes throughout the project. Please note that there will always be access in all directions at all times. Closure Map
- Snow Way Drive - May 21 thru July 18. Snow way will be closed between the west entrance to the Snow Way Garage and the Law School in phases. Traffic will be two-way on Snow Way from Big Bend to the west entrance of the Snow Way Garage. Please see map for more details. Closure Map
- Steinberg Hall - May 1 thru August 17. Steinberg hall will be closed for continuing construction and renovation.
- Law School - May 21 thru August 17. Access to the south side of the Law School will be affected due to utility installation. Temporary bridges will be used at the south entrances to afford access, with the occasional shutdown of an entrance. Utility construction will also take place on the east side of the Law School, with bridges in place over the work for emergency egress. In addition, a portion of the northeast area of the parking lot to the south of the Law School will be permanently removed. See map for more details. Closure Map
- University Center - July 2008. Closure Map
- Parking Lot 26 / Village East - May 21 thru August 2008. The Parking lot located east of Millbrook 2 apartments Will be permanently closed. The construction of the Village East Apartments will begin in its place. Closure Map
Links:
Construction Home
Weekly Closures
Upcoming Closures
Facilities Planning and Management
Home
Contacts
Administrative Services
Capital Projects and Records
Maintenance Operations
Sustainability
Utility Operations
Construction Closures